第一台自制 2 兆瓦风力发电机连接到伊朗国家电网

来源: Mehr News在原始来源打开 ↗
30/09/2026 às 10:3133 浏览
Foto: AVISO: midia ligada ao Estado iraniano / Mehr News
Sep 30, 2026, 2:01 PM
1st homemade 2-MW wind turbine linked to Iran’s Natl. grid
Imagem do artigo

TEHRAN, Sep. 30 (MNA) – Iran has connected its first fully domestically designed and manufactured 2-megawatt wind turbine to the national electricity grid, the energy minister announced.

Iran's Minister of Energy Abbas Aliabadi said the turbine was successfully synchronized with the national grid on September 29 after the completion of mechanical installation and the resolution of technical challenges.

The minister noted that the achievement is not the result of reverse engineering, emphasizing that the turbine’s technical know-how has been developed entirely by Iranian researchers and brought to the production stage based on the country’s climatic conditions.

Aliabadi added that final measures are currently underway to stabilize the turbine’s performance and expressed hope that it would operate at its full rated capacity in the coming days, contributing to the country’s electricity generation portfolio.

The achievement marks more than the completion of a single project, he added, describing it as a foundation for Iran to design and manufacture wind turbines with higher capacities and greater power output.

MNA

News ID 248213
来源
Mehr News
打开原文 ↗

⚙内容由机器自动翻译。

这条新闻有用吗?

讨论 0

Seja o primeiro a contribuir com o debate.

分享您的信息并推广您的观点

请勿犹豫,发布可能有用的信息或数据。

参与讨论,请登录或免费注册。