Engineers at L3Harris Technologies, a contractor for the Roman Coronagraph Instrument, are shown inspecting the instrument’s optical path, which feeds light from the telescope into the instrument. Two people on the left of the image are wearing white full-body suits and are bent down, looking up at the instrument components. The hardware in front of them are made up of metal boxes and electrical wires, set on pedestals that lift them up above the engineers’ heads. The topmost instrument has textured red sides and blue and pink wires. All of the components are inside a silver framework with a black panel on top. Photo credit: Chris Gunn/ NASA JPL
Engineers at L3Harris Technologies, a contractor for the Roman Coronagraph Instrument, are shown inspecting the instrument’s optical path, which feeds light from the telescope into the instrument. Two people on the left of the image are wearing white full-body suits and are bent down, looking up at the instrument components. The hardware in front of them are made up of metal boxes and electrical wires, set on pedestals that lift them up above the engineers’ heads. The topmost instrument has textured red sides and blue and pink wires. All of the components are inside a silver framework with a black panel on top. Photo credit: Chris Gunn/ NASA JPL
NASA Clima
Operations, Research, and Broad Innovative Technology Services (ORBIT)

Points of Contact

Name: Edwin Ortiz-Franco
Title: Contracting Officer
Email: jsc-orbit-procurement@mail.nasa.gov

Name: Justin Pontiff
Title: Contract Specialist
Email: jsc-orbit-procurement@mail.nasa.gov

Source Selection Authority (SSA): TBD

Electronic responses are through sam.gov.

Current Information

Sources Sought Synopsis and Related Documents

Requirements Request for Information and Related Documents

Industry Day Communications and Related Documents

Pre-Proposal Conference Information

Pre-Solicitation Synopsis and Related Documents

Draft and Final Request for Proposal and Related Documents

Technical Documents

Acquisition Milestone Schedule

Preliminary Acquisition Schedule

Milestone
Request for Information (RFI)/Sources Sought Synopsis
Industry Day
Release Draft Request for Proposal
Release Final Request for Proposal
Pre-Proposal Conference
Contract Award
Contract Start
Planned Date
09/03/2026
10/15/2026
12/31/2026
02/08/2027
02/15/2027
07/20/2027
10/01/2027
Actual Date
09/04/2026






News and Events

08/27/2026 ORBIT website created.

Postings to sam.gov and to this website will be made as Industry Day or Pre-Proposal Conference dates are developed. Vendors are able to indicate interest in this opportunity through the Interested Vendors List in each sam.gov posting.  Parties that would like their information posted to the Interested Vendors List in sam.gov shall use the “Add Me To Interested Vendors List” button.  If a vendor would like to be removed from the Interested Vendors List, use the “Remove Me From Interested Vendors” button. 

This website shall be shutdown 30 days after the Final Debriefing or at the end of the protest period, whichever comes later.

Point of Contact: Edwin Ortiz-Franco, Contracting Officer
SAM.gov | NASA’s Guide on Organizational Conflicts of Interest

The post ORBIT appeared first on NASA Science.

Fonte
NASA Clima
Abrir original ↗
Esta notícia foi útil?

Debates 0

Seja o primeiro a contribuir com o debate.

Difunda suas informações e promova seu argumento

Não se acanhe de publicar alguma informação ou dado que possa ser positivo ou útil.

Para participar do debate, entre com sua conta ou crie uma gratuita.